Easement Plan

Location:
Argenton, NSW
Scope:
This project required the creation of an easement to drain water from a new building at the rear of the lot into the adjoining land's drainage system.
Parker Scanlon REF
B2542

Project Details

The easement was necessary to establish the right to drain water onto the adjoining owner’s land, as well as to provide access and maintenance for the infrastructure required to facilitate the drainage.

We handled the survey components of the easement plan, along with the 88B instrument documentation required for the creation of the easement.